Cintermex – HVAC

Insights

  • Phase III extension for Expo Spaces

  • More than 70 tons of steel ductworking installed

  • 100,000 m2

  • 2.5 years payback

  • 2.5 MUSD

  • 60 indirect workers

  • HVAC: Re-enginnering and Installarion of 4,000 Ton Chilled Water Plant; 400,000 CFM AHU System; 300,000 CFM Ventilation System; 9,000 GPM Electrolitic chemical-free water treatment system