Torre Pacífico

The 433-metre structure has a 126-metre central span that lifts to a height of 53 metres in just 11 minutes to allow ships to enter. The bridge showcases VINCI Construction’s wide-ranging expertise in foundations, mechanical engineering, marine works and civil engineering.

Insights

  • 7 floor office-space remodeling

  • HVAC Infusser system

  • MEP Analysis, Enginnering and supervision

  • BMS for HVAC, Lighting and Security systems

  • Electrical system

  • Category

  • Año

    1,600