Torre Mayor – CDMX

The 433-metre structure has a 126-metre central span that lifts to a height of 53 metres in just 11 minutes to allow ships to enter. The bridge showcases VINCI Construction’s wide-ranging expertise in foundations, mechanical engineering, marine works and civil engineering.

Insights

  • 8 floor office-space remodeling

  • 10,000 m2

  • 1.5 year payback

  • 2 MUSD

  • 40 indirect workers

  • 500 KUSD on investment savings for customer with engineering solutions

  • Technology Contracting: HVAC, Acces, Detectionn, Extintion, CCTV, Lighting Controls, electric, plumbing & BMS

  • Category

  • Año

    $350,000,000