Spellman – Matamoros, Tamaulipas

The 433-metre structure has a 126-metre central span that lifts to a height of 53 metres in just 11 minutes to allow ships to enter. The bridge showcases VINCI Construction’s wide-ranging expertise in foundations, mechanical engineering, marine works and civil engineering.

bvnvvghv

Insights

  • First Gas Cooling Project at Mexico

  • Gas-Engine-Driven Chillers

  • LEED Silver Project

  • 1.2 MUSD

  • Payback 1.2 years

  • 20,000 m2 de Plant and Offices

  • 40 indirect workers

  • 450 Ton Chilled Water Plant and Air Distribution System

  • Category

  • Año

    2,200,000