Honeywell – Mexicali, Baja California

The 433-metre structure has a 126-metre central span that lifts to a height of 53 metres in just 11 minutes to allow ships to enter. The bridge showcases VINCI Construction’s wide-ranging expertise in foundations, mechanical engineering, marine works and civil engineering.

Insights

  • Engineering, Supply and Installation of chillers and diverse AHU’s

  • Category

  • Año

    05.03.2001